Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2019 | ELECTRIC - FINAL | Not ready for Inspection | Unable to access for inspection. Left voicemail with contact on file. | |
| 08/12/2019 | ELECTRIC - FINAL | Approved | ||
| 08/08/2019 | ELECTRIC - FINAL | Not ready for Inspection | Arrived at site at 2:15 PM. Rang bell and knocked on door. Gate locked. No access to garage. Please recall with access information. | |
| 08/06/2019 | ELECTRIC - FINAL | Denied | 1. All outlets in the garage/storage area, must be gfi protected. 2. Sub panel neutral and ground bars must be separated from each other. This will require removing the connecting bar that runs behind the buss bar. Then the ground bar must be connected to the panel jacket with the green ground screw and s bar attachment to the ground bar. |