Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 11/27/2019 |
ENGINEERING - FINAL |
|
Approved |
|
| 10/25/2019 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
Correct accessible parking sign. Complete The work shown in plan keynotes 23 and 25, also referenced in site data note numbers four, five and six, also referenced in lot number two Parking calculations. |
| 10/21/2019 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
Call for inspection, and have a proved all required inspections under DP18 Dash 0315. Provide approved civil drawings at the time of inspection. |