Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/31/2019 | PLUMBING - INTERMEDIATE | Approved | ||
| 05/30/2019 | PLUMBING - INTERMEDIATE | Denied | 1. Secure toilet flange to floor. 2. Need dwv test on abs. 3. Move main pex water line at least 12” from can lights, from main water riser to bathroom. 4. Redline and resubmit plan as-builds, for electric, mechanical and water heater. Note: if water heater is not within sight of electric panel, it must have a disconnect box at unit or a lockout breaker. |