Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/05/2020 |
ENGINEERING - FINAL |
|
Approved |
|
| 02/04/2020 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
THE ACCESS FROM THE SITE HAS NOT BEEN PROVIDED AS DISCUSSED DURING OUR ONSITE VISIT. SEE THE NOTES BELOW THAT HAVE BEEN POSTED FOR THE DEVELOPMENT PACKAGE. ADDRESS THE PEDESTRIAN ACCESS ISSUES FOR THIS SITE PRIOR TO RESCHEDULING THIS SITE FOR THE TCO FOR THIS PERMIT. THE PEDESTRIAN AREA WILL NEED TO BE ADA COMPLIANT AND FREE OF WATER, CURRENTLY A ROOF DRAIN IS LOCATED WITHIN THIS AREA THAT WILL NEED TO BE REDIRECTED TO ANOTHER AREA. |
| 08/05/2019 |
ENGINEERING - FINAL |
|
Partial Approval |
PARTIAL APPROVAL for TI on existing building separation from new construction and public OK walk site with GC went over separation. OK for TCOfor existing building only. From engineering only. New construction Still under construction. |