Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2019 | BUILDING - FINAL | Approved | 1- Clear Gas meter Verbal clearance called in at 2:14 pm |
|
| 06/26/2019 | BUILDING - FINAL | Cancelled | Cancel by ?Contractor | |
| 06/24/2019 | BUILDING - FINAL | Partial Approval | 1- Shall provide a smoke detector in the existing rear bedroom. 2- Shall provide 6 inches of clearance from combustion material for the water heater single wall flu vent and provide (3) sheet metal screws per joint and at water heater draft collar. |
|
| 06/21/2019 | BUILDING - FINAL | Partial Approval | Pending other inspections. |