Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/2019 | MECHANICAL - FINAL | Approved | ||
| 09/19/2019 | MECHANICAL - FINAL | Denied | 1- Shall replace the flex connector to the Gas pack on roof. The nomenclature tag has been painted and can not verify size, length and BTU load. 2- Shall provide a flashing for the condensate line roof penetration. | |
| 09/05/2019 | MECHANICAL - FINAL | Denied | 1- Shall extend and terminate the condensate drain a minimum of 6 inches above sub grade. 2- Condensate drain has back pitch and shall be protected with approved coating. Note; The owner has allowed the tenants move in without the building final approval. |
|
| 08/30/2019 | MECHANICAL - FINAL | Denied | 1- No one home at time of inspection request. | |
| 07/24/2019 | MECHANICAL - FINAL | Not ready for Inspection | previous corrections were not addressed at all. Another failed inspection will result in a reinspection fee. | |
| 07/23/2019 | MECHANICAL - FINAL | Partial Approval | smoke alarm outside new sleeping area needs to be carbon monoxide as well. Kitchen either needs exhaust fan or hood installed. Water heater either needs disconnect or lock out tag out at panel. T&P piping needs to be installed. |