Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2018 | PLUMBING - FINAL | Approved | after corrections from 12 11 18 Gas clearance |
|
| 12/11/2018 | PLUMBING - FINAL | Partial Approval | 1- Shall provide a gas bond on system. 2- Shall provide double wall flu vent on the exterior located water heater. 3- - Shall provide a carbon monoxcide detector and locate near the gas appliance. Note; Verbal clearance called in at 9:00am |