Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2020 | FRAMING | Approved | ||
| 02/07/2020 | FRAMING | Partial Approval | Provide fire blocking and fire rated sealant at all top plate penetrations, including furred out walls. | |
| 11/22/2019 | FRAMING | Not ready for Inspection | Call for framing with intermediates. | |
| 08/26/2019 | FRAMING | Not ready for Inspection | Stopped inspection after many rows of of roof nailing missed when first mounted. Several rows of wall osb not nailed after walking 1/4 of perimeter. Check all and renail where needed and recall. |