Inspection Status: Approved
Inspection History: SHEET ROCK NAILING
| Date |
Description |
Inspector |
Results |
Comments |
| 07/30/2019 |
SHEET ROCK NAILING |
|
Approved |
|
| 05/21/2019 |
SHEET ROCK NAILING |
|
Partial Approval |
Unit #6 ok only |
| 05/07/2019 |
SHEET ROCK NAILING |
|
Partial Approval |
Upstairs rooms 7-12 and 103 To include 5/8” sheet rock fire separations between units on walls |
| 04/19/2019 |
SHEET ROCK NAILING |
|
Partial Approval |
units #1, 32, 2, 4 and downstairs hallway. Double 1/2" on ceilings |
| 04/12/2019 |
SHEET ROCK NAILING |
|
Partial Approval |
OK to proceed second layer ceilings. |
| 04/10/2019 |
SHEET ROCK NAILING |
|
Denied |
Provide RFI for all ceiling fire separations prior to next inspection |
| 04/02/2019 |
SHEET ROCK NAILING |
|
Partial Approval |
units inspected were 5 and 3. Need an RFI or an email from the design team stating what is being done on the fire walls and ceilings meets a one hour rating necessary between units. Currently there is half inch type C on walls and ceilings which is raising Questions. |
| 04/01/2019 |
SHEET ROCK NAILING |
|
Partial Approval |
Units 3 & 5 pending Friday for fire separation at ceilings |