Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/21/2018 | EXT METAL CLIPS/EXT SHEATHING | Approved | ||
| 12/18/2018 | EXT METAL CLIPS/EXT SHEATHING | Correction Required | 1-Remove table siding and upper row of shear; replace with one piece shear from joint to roof. 2-Install CS a minimum of 12 inches above and below horizontal 6 by 6. 3-Fireblock ceilings. 4-Support overspanned 2 by 4 ceiling joists at mid span. |