Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/17/2019 | EXT METAL CLIPS/EXT SHEATHING | Approved | ||
| 01/15/2019 | EXT METAL CLIPS/EXT SHEATHING | Denied | 1. Nail all king studs in sheer walls, including two rows above hold downs where needed. 2. H2.5 clip entry trusses. 3. Clip or lag patio roof ledger. 4. Add three studs under north end of second floor girder truss and block for transfer to first floor. |