Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/02/2021 | PLUMBING - ROUGH, SOIL | Approved | AP | |
| 01/30/2019 | PLUMBING - ROUGH, SOIL | Partial Approval | Shower pan remains to be inspected. | |
| 01/25/2019 | PLUMBING - ROUGH, SOIL | Correction Required | Finish corrections as discussed Shower pan, closet rings, etc. |
|
| 01/24/2019 | PLUMBING - ROUGH, SOIL | Cancelled | ||
| 01/23/2019 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | Job walk with Angel for corrections. Angel will correct all and call in B E M P intermediates for next inspection. | |
| 01/22/2019 | PLUMBING - ROUGH, SOIL | Correction Required | to many corrections to write on all. Builder will recall and have his own pad of paper to get corrections. |
|
| 01/16/2019 | PLUMBING - ROUGH, SOIL | Correction Required | 1-Need more slope in laundry and kitchen branch per P3005.3. 2-Provide test on piping. |