Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - CONSTRUCTION POWER
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/16/2019 | ELECTRIC - CONSTRUCTION POWER | Approved | ||
| 01/10/2019 | ELECTRIC - CONSTRUCTION POWER | Not ready for Inspection | Per phone call w/owner-Contractor at 11:30 AM. Not Ready, they will call back in when corrections are complete. | |
| 01/09/2019 | ELECTRIC - CONSTRUCTION POWER | Correction Required | Expose 2 ground rods and nuts GEC shall be determined per NEC table based on service entrance cable size Show Gas Bond and water bond Label all breakers in service panel Receptacles in kitchen @ 4 ‘ OC and living area at 12’OC plus any particulars. |