Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2019 | FRAMING | Approved | ||
| 01/25/2019 | FRAMING | Not ready for Inspection | Finish installing all framing as discussed. | |
| 01/24/2019 | FRAMING | Cancelled | ||
| 01/23/2019 | FRAMING | Not ready for Inspection | Job walk with Angel for corrections. Angel will correct all and call in B E M P intermediates for next inspection. | |
| 01/22/2019 | FRAMING | Correction Required | to many corrections to write on all. Builder will recall and have his own pad of paper to get corrections. |
|
| 01/16/2019 | FRAMING | Partial Approval | Beams supporting roof where bearing walls have been removed are not per approved plans. Note: I suggested these be installed with posts and post bases at 1005/1015/1020 inspection to save time and allow preparation for 1080 | |
| 01/16/2019 | FRAMING | Correction Required | Beams supporting roof where bearing walls have been removed are not per approved plans. Note: I suggested these be installed with posts and post bases at 1005/1015/1020 inspection to save time and allow preparation for 1080. |