Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T18CM09109
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/29/2018 | PLUMBING - INTERMEDIATE | Approved | ||
11/28/2018 | PLUMBING - INTERMEDIATE | Correction Required | Install ABS 90 instead of PVC for vent | |
11/23/2018 | PLUMBING - INTERMEDIATE | Denied | Complete venting exposeFooters to verify depth missing post at porch beam Porch Rafters not per plan will accept FHA straps every other rafter with pan head screws into metal and TECO Nails into wood. Rafters attached to existing fascia expose all electrical for inspection or provide letterhead from licensed electrical contractor stating all work per plan is to code for safety |