Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS RECONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/19/2018 | PLUMBING - GAS RECONNECT | Approved | Clear gas reconnect | |
| 11/15/2018 | PLUMBING - GAS RECONNECT | Denied | 1- Shall provide a air pressure test on the entire system. 2- Shall provide a gas bond with a #6 conductor. 3- Shall provide double wall flu vent and extend and terminate 3- feet above the cooler. 4- Shall provide a water heater drip pan and cap off the drain and extend and terminate the T & P drain into the pan with CPVC, copper, or galvanized piping |