Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/24/2019 | ELECTRIC - FINAL | Approved | TEP DGC | |
| 01/14/2019 | ELECTRIC - FINAL | Partial Approval | Change 40 amp double pole breaker in main panel to a 35 amp double pole breaker per plan. All roof components are OK. |