Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T18CM08866

Parcel: 12310001H


Addresses:

1501 N CAMPBELL AV


Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Permit Number - T18CM08866

Inspection Description - PLUMBING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
11/26/2019 PLUMBING - INTERMEDIATE Approved
05/16/2019 PLUMBING - INTERMEDIATE Partial Approval Tower #4; Level #9: Soft water main lines throughout (1/2" - 1 1/2"). Domestic hot and cold lines. Supply and return lines at 1/2" - 3" throughout level. Hose bib lines (1") 2 each to roof.. Ok to insulate progress areas. North equipment storage room, waste and vent lines (2"-4").

Note: Plumbing intermediate for Tower #4, Level #9 has been completed. Level #3 is attached to a his permit and has not been completed.
05/15/2019 PLUMBING - INTERMEDIATE Partial Approval Tower #4, Level #9; CIS North Domestic water lines (1/2”).
05/13/2019 PLUMBING - INTERMEDIATE Not ready for Inspection Contractor cancelled.
05/10/2019 PLUMBING - INTERMEDIATE Partial Approval Tower #4, Level #9: Domestic hot and cold lines (1/2”-3/4”) in East Nourishment Room, Med prep, Isolation Room West, Equipment Storage Room. Ok to insulate progress areas. Waste and vent lines (2”-3”) in rooms: East Nourishment Room, Med. Prep, Isolation Room West.
05/09/2019 PLUMBING - INTERMEDIATE Partial Approval Tower #4, Level #9, Domestic water lines (1/2”); Corridor lavatories East and West, Soiled linen room, Nurses station. Isolation room west lines 1/2”-3/4”. Ok to insulate progress areas.
05/08/2019 PLUMBING - INTERMEDIATE Partial Approval Tower #4, Level #9; Waste and vent lines at 2”-4”; Isolation Room West, Dialysis Room West, Soiled linen room. Domestic water (hot and cold), 1/2” lines at corridor lavatories East and West.
05/03/2019 PLUMBING - INTERMEDIATE Partial Approval Tower #4, Level #9. Break room, 3” vent lines. Waste and vent lines (2”-3”) in Nourishment room and Med Prep room. Domestic hot and cold lines (1/2”) at 2 lavatory stations in corridor.
05/02/2019 PLUMBING - INTERMEDIATE Partial Approval Tower #4, Level #9: Domestic water lines (1/2”-3”) in rooms 940104, 940106, 940107, 940108.
05/01/2019 PLUMBING - INTERMEDIATE Partial Approval Tower #4, Level #9: waste and vent lines (2"-4") at GL: 13/K-I. Domestic water lines (1/2"-2"); hot and cold lines. Rooms #22-23.
04/30/2019 PLUMBING - INTERMEDIATE Not ready for Inspection Contractor cancelled. Will recall for 1 May
04/29/2019 PLUMBING - INTERMEDIATE Partial Approval Waste and vent lines (2”-4”) at GL. K-N/13 (patient rooms). Domestic water lines at 1/2”-2” in rooms #18, 20, 21. GL: 13/K-N.
04/25/2019 PLUMBING - INTERMEDIATE Partial Approval Rm 16 and 17 at Column L. Eastside Dialysis box 120 psi test. Rm 18 and 19 at Column K. Dialysis box 100 psi test. Rm 18 and 19 at Column K. In wall and overhead at restrooms. 120 psi test. Rm 21 and 22 at Column J. Restroom. 120 psi test. Victor-Plummer
04/22/2019 PLUMBING - INTERMEDIATE Partial Approval Tower #4; Level #9. Waste and vent lines (2"-4") atGL: 10/I-K.
Domestic hot and cold water lines 1/2"-2" in rooms #13-15.
04/19/2019 PLUMBING - INTERMEDIATE Partial Approval Tower #4, Level #9. Domestic water lines (hot and cold), 1/2”-2” lines. Rooms #13 & 14
04/18/2019 PLUMBING - INTERMEDIATE Partial Approval Tower #4; Level #9, waste and vent lines (2”-4”) at GL: 10/K-M
04/17/2019 PLUMBING - INTERMEDIATE Partial Approval Tower #4; Level #9. Patient rooms at GL: 10/J.5-N, domestic water lines at 1/2”-2”; all under test..
04/16/2019 PLUMBING - INTERMEDIATE Partial Approval Tower #4, Level #9: Rooms. #21-24, waste and vent lines (2”-4”). Domestic water lines (3/4”-2”). All lines are under test.
04/15/2019 PLUMBING - INTERMEDIATE Partial Approval Tower #4, Level #9, Rooms #25 and #26; 1 1/2" and 2" waste and vent lines, 3/4" domestic water lines. Room #24; 3/4" domestic water lines only
03/06/2019 PLUMBING - INTERMEDIATE Partial Approval Waste and vent lines (2" - 4" lines), hot and cold water lines (1/2" - 3/4") in PACU Areas and OR #1. All lines water or air tested.
Level #3, PACU UNIT