Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/26/2019 | PLUMBING - INTERMEDIATE | Approved | ||
05/16/2019 | PLUMBING - INTERMEDIATE | Partial Approval | Tower #4; Level #9: Soft water main lines throughout (1/2" - 1 1/2"). Domestic hot and cold lines. Supply and return lines at 1/2" - 3" throughout level. Hose bib lines (1") 2 each to roof.. Ok to insulate progress areas. North equipment storage room, waste and vent lines (2"-4"). Note: Plumbing intermediate for Tower #4, Level #9 has been completed. Level #3 is attached to a his permit and has not been completed. |
|
05/15/2019 | PLUMBING - INTERMEDIATE | Partial Approval | Tower #4, Level #9; CIS North Domestic water lines (1/2”). | |
05/13/2019 | PLUMBING - INTERMEDIATE | Not ready for Inspection | Contractor cancelled. | |
05/10/2019 | PLUMBING - INTERMEDIATE | Partial Approval | Tower #4, Level #9: Domestic hot and cold lines (1/2”-3/4”) in East Nourishment Room, Med prep, Isolation Room West, Equipment Storage Room. Ok to insulate progress areas. Waste and vent lines (2”-3”) in rooms: East Nourishment Room, Med. Prep, Isolation Room West. | |
05/09/2019 | PLUMBING - INTERMEDIATE | Partial Approval | Tower #4, Level #9, Domestic water lines (1/2”); Corridor lavatories East and West, Soiled linen room, Nurses station. Isolation room west lines 1/2”-3/4”. Ok to insulate progress areas. | |
05/08/2019 | PLUMBING - INTERMEDIATE | Partial Approval | Tower #4, Level #9; Waste and vent lines at 2”-4”; Isolation Room West, Dialysis Room West, Soiled linen room. Domestic water (hot and cold), 1/2” lines at corridor lavatories East and West. | |
05/03/2019 | PLUMBING - INTERMEDIATE | Partial Approval | Tower #4, Level #9. Break room, 3” vent lines. Waste and vent lines (2”-3”) in Nourishment room and Med Prep room. Domestic hot and cold lines (1/2”) at 2 lavatory stations in corridor. | |
05/02/2019 | PLUMBING - INTERMEDIATE | Partial Approval | Tower #4, Level #9: Domestic water lines (1/2”-3”) in rooms 940104, 940106, 940107, 940108. | |
05/01/2019 | PLUMBING - INTERMEDIATE | Partial Approval | Tower #4, Level #9: waste and vent lines (2"-4") at GL: 13/K-I. Domestic water lines (1/2"-2"); hot and cold lines. Rooms #22-23. | |
04/30/2019 | PLUMBING - INTERMEDIATE | Not ready for Inspection | Contractor cancelled. Will recall for 1 May | |
04/29/2019 | PLUMBING - INTERMEDIATE | Partial Approval | Waste and vent lines (2”-4”) at GL. K-N/13 (patient rooms). Domestic water lines at 1/2”-2” in rooms #18, 20, 21. GL: 13/K-N. | |
04/25/2019 | PLUMBING - INTERMEDIATE | Partial Approval | Rm 16 and 17 at Column L. Eastside Dialysis box 120 psi test. Rm 18 and 19 at Column K. Dialysis box 100 psi test. Rm 18 and 19 at Column K. In wall and overhead at restrooms. 120 psi test. Rm 21 and 22 at Column J. Restroom. 120 psi test. Victor-Plummer | |
04/22/2019 | PLUMBING - INTERMEDIATE | Partial Approval | Tower #4; Level #9. Waste and vent lines (2"-4") atGL: 10/I-K. Domestic hot and cold water lines 1/2"-2" in rooms #13-15. |
|
04/19/2019 | PLUMBING - INTERMEDIATE | Partial Approval | Tower #4, Level #9. Domestic water lines (hot and cold), 1/2”-2” lines. Rooms #13 & 14 | |
04/18/2019 | PLUMBING - INTERMEDIATE | Partial Approval | Tower #4; Level #9, waste and vent lines (2”-4”) at GL: 10/K-M | |
04/17/2019 | PLUMBING - INTERMEDIATE | Partial Approval | Tower #4; Level #9. Patient rooms at GL: 10/J.5-N, domestic water lines at 1/2”-2”; all under test.. | |
04/16/2019 | PLUMBING - INTERMEDIATE | Partial Approval | Tower #4, Level #9: Rooms. #21-24, waste and vent lines (2”-4”). Domestic water lines (3/4”-2”). All lines are under test. | |
04/15/2019 | PLUMBING - INTERMEDIATE | Partial Approval | Tower #4, Level #9, Rooms #25 and #26; 1 1/2" and 2" waste and vent lines, 3/4" domestic water lines. Room #24; 3/4" domestic water lines only | |
03/06/2019 | PLUMBING - INTERMEDIATE | Partial Approval | Waste and vent lines (2" - 4" lines), hot and cold water lines (1/2" - 3/4") in PACU Areas and OR #1. All lines water or air tested. Level #3, PACU UNIT |