Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 11/26/2019 |
FRAMING |
|
Approved |
|
| 05/14/2019 |
FRAMING |
|
Partial Approval |
Tower #4, Level #9; East Isolation Room waste and vent lines at 1 1/2” - 4”. East Dialysis Room Domestic water lines at 1/2”. Ok to insulate progress areas. |
| 05/07/2019 |
FRAMING |
|
Partial Approval |
Tower #4, Level #9: Lavatory waste line 3" at Southeast corridor at GL: L-M. Isolation rooms, East and West: Domestic hot and cold lines: 1/2"-2". Ok to insulate progress areas. |
| 04/10/2019 |
FRAMING |
|
Partial Approval |
Level #9, Tower #4. Rooms and corridors. Ok to one side Sheetrock corridor side. |
| 02/25/2019 |
FRAMING |
|
Partial Approval |
Rooms: all walls except for bathroom areas; corridors. |