Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T18CM08812

Parcel: 11205090G

Inspection Status: Approved

Inspection History: BUILDING PRE-SLAB

Date Description Inspector Results Comments
02/12/2019 BUILDING PRE-SLAB Approved
02/05/2019 BUILDING PRE-SLAB Correction Required Footings must conform to the designed plan. Any changes to the design must be designed and approved by the plan designer and then approved by the COT.