Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T18CM08756
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/21/2018 | PLUMBING - FINAL | Approved | Clear gas meter Verbal clearance called in at 8:25am |
|
11/19/2018 | PLUMBING - FINAL | Denied | 1- Shall seal the exterior gas penetration at rear of house. 2- Shall provide (3) sheet metal screws per joint on the water heater vent connector and draft collar. 3- Shall provide a water heater drip pan and terminate the T & P drain into the pan. 4 - Shall provide the approved plan and permit on site at time of inspection request. 5- Shall provide a carbon monoxcide detector and locate near the water heater |