Inspection History Details
Inspection Status: Approved
Inspection History: ROOF NAILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/21/2018 | ROOF NAILING | Approved | ||
| 12/18/2018 | ROOF NAILING | Denied | Need blocking 24 inches on center at drop cord trusses which formed the hip framingCannot prove the roof nailing at this time without the blocking being in place. Same issue on 974 S. Cass star Dr. | |
| 12/12/2018 | ROOF NAILING | Denied | roof nailing trusses missing blocks follow the roofline of mono trusses continue 2x4f between a trusses at both sides of home 24 inches on center see manufactures standard procedure for setting hip trusses Plywood is designed to be supported perpendicular (90 degrees) to framing as built it’s parallel, therefore, edges aren’t nailed in those areas after blocking is installed read mail that section of roof both sides of house |