Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/02/2018 | ELECTRIC - FINAL | Approved | RECN ok to clear. | |
| 10/31/2018 | ELECTRIC - FINAL | Not ready for Inspection | ||
| 10/22/2018 | ELECTRIC - FINAL | Correction Required | neither the hallway or the bedroom smoke detectors work. Must be in working condition. Repair or replace substandard electrical service to this unit. Need, 2 ground rods, GEC, water bond, gas bond, and labeled circuit breakers. Shower plumbing must drain into the building drain and not be cut off to drain out the wall onto the side setback. Water heater needs a shut-off valve on the cold water side |