Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2019 | BUILDING - FINAL | Approved | revise drawings reflecting the 125 amp panel that is installed as the drawings call for a 200 amp pane | |
| 02/11/2019 | BUILDING - FINAL | Not ready for Inspection |