Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: RSBU - Building Final
Permit Number - T18CM08241
Inspection Description - RSBU - Building Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/18/2019 | RSBU - Building Final | JBURGE | Approved | Entered by DMERANZ1 - |
09/13/2019 | RSBU - Building Final | TVALENCIA | Not ready for Inspection | Entered by DMERANZ1 - 1- Customer called and cancelled the inspection request. |
09/10/2019 | RSBU - Building Final | ESTEVENS | Not ready for Inspection | Entered by DMERANZ1 - Anti-tip on stove. GFCI on counter. Caulk toilet. N.E. bedroom outlet not working. Fuse size for compressors on the roof. |
06/10/2019 | RSBU - Building Final | MHASSAN | Not ready for Inspection | Entered by CBELL1 - not at this stage of the job. Front door has a step that’s about 3 to 4 inches. This needs to be addressed before final as the house needs a path of egress from front bedroom that is not more than 1 1/2” lower than top of threshold (R311.3.1). |