Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/10/2019 | ENGINEERING - FINAL | Approved | ||
| 08/05/2019 | ENGINEERING - FINAL | Partial Approval | Shell building OK for TCO only open overall grading permit. | |
| 07/31/2019 | ENGINEERING - FINAL | Partial Approval | Notes have been completed from Brian and Dave’s inspections per Dave’s inspections TCO OK for shell building only. | |
| 07/12/2019 | ENGINEERING - FINAL | Not ready for Inspection | Trash enclosure has not been completed. Accessible pedestrian access from the street has not yet been installed. |
|
| 06/05/2019 | ENGINEERING - FINAL | Partial Approval | FOR THE SHELL BUILDING ONLY, NO CONSIDERATION FOR OCCUPANCY, SHELL ONLY. COMPLETE THE INSTALLATION OF ALL REQUIRED HANDICAP SIGNS, STRIPING, MARKINGS, PARKING BLOCKS BEFORE SEEKING A TEMPORARY CERTIFICATE OF OCCUPANCY. |