Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2019 | FIRE SPKLR - FINAL | Approved | ||
| 06/10/2019 | FIRE SPKLR - FINAL | Partial Approval | 1. Provide copy of NFPA 25 manual 2. Provide locking FDC plug 3. Install Riser Room and FACP signage Bell rang 34 seconds 50psi residual on flow test |