Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T18CM08172
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/23/2019 | ENGINEERING - FINAL | Approved | ||
06/18/2019 | ENGINEERING - FINAL | Not ready for Inspection | Engineering does not have any issues preventing TCo. One accessible parking space requires correction. Sidewalks are OK. Provide revisions for changes made, including accessible routes. Rain water may not drain over accessible walkways or loading zone. At associate entrance canopy. Bicycle parking has not installed. Trash enclosure is less than 6 feet tall, and the doors do not open fully. Correct the doors, drill holes for the Door pins. Provide the letter from your engineer stating that the trash enclosure has been constructed get accordance with detail COT Standard detail 6.01. Provide the letter certifying final grade. Complete landscaping, some trees are missing, some trees require staking, also ground cover and clean up still needed. Remove temporary fencing. Complete the installation of your signage |
|
06/17/2019 | ENGINEERING - FINAL | Not ready for Inspection | Complete the work shown on the DP permit and schedule for inspection. Thank you | |
06/06/2019 | ENGINEERING - FINAL | Continued | COMPLETE ALL AREAS FOR PEDESTRIAN ACCESS, INSTALL ALL HANDICAP ACCESS PARKING SIGNS, REMOVE ROOF DRAINAGE THAT DEPOSITS DIRECTLY ONTO THE SIDEWALKS ADJACENT TO THE ASSOCIATE ENTRANCE. COMPLETE ALL SITE WORK,LANDSCAPING, AND GENERAL CLEANUP OF ALL EXTERIOR AREAS, ROADWAYS, AND PARKING LOTS. | |
05/15/2019 | ENGINEERING - FINAL | Not ready for Inspection | Complete the work shown on DP18-0272. Provide access to the building For TCO. Call for and have a proved all completed permits and inspections. | |
03/19/2019 | ENGINEERING - FINAL | Prior to Final Inspectn | Confirm drainage basin drawdown time to be less than 12 hours | |
11/07/2018 | ENGINEERING - FINAL | Prior to Final Inspectn | PROVIDE LOT COMBINATION AND EASEMENT RECORDATION DOCUMENTS PRIOR TO ENGINEERING FINAL |