Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2019 | MECHANICAL - FINAL | Approved | ||
| 02/21/2019 | MECHANICAL - FINAL | Not ready for Inspection | Closet locked, no access Spoke to contractors office and stated I would arrive after 2 stops. She said fine and thank you. |
|
| 02/05/2019 | MECHANICAL - FINAL | Denied | 1. Need secondary condensate line or automatic shut off. 2. Need drip leg on gas line. 3. Need supported air gap between condensate drain and sewer drain, or run into exterior. 4. Finish insulating HVAC lines in closet. 5. U-V Protect exterior HVAC lines tape. 6. Unit maximum fuse is 30 A. Presently it is 40 A. 7. Install tamper proof caps. |