Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
Permit Number - T18CM08113
Inspection Description - FIRE - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/27/2018 | FIRE - FINAL | Approved | 12/27/2018 | |
11/29/2018 | FIRE - FINAL | Partial Approval | OK FOR TCO FOR FULL OCCUPANCY (SENT TO RECORDS) | |
11/29/2018 | FIRE - FINAL | Partial Approval | APPROVED TO OBTAIN TCO FOR FULL OCCUPANCY Outstanding items for final: 1) Mount knox box next to riser door. Provide keys. 2) Mount sign "riser room" to door. 3) Mount sign "FACP" to door. 4) Post OL sign in A3 5) Will move/install 2 exit signs as discussed in A3. Mike Floyd 603-1748 |
|
11/28/2018 | FIRE - FINAL | Cancelled | Fees need to be paid by cutler before an inspection is scheduled. If inspector goes out prior additional fees will be added. | |
11/19/2018 | FIRE - FINAL | Partial Approval | -Install panic hardware on existing doors per plans. -install all fixed seating prior to the fire final. -install all ceiling tiles. -need annual sprink inspection report. deficiencies resolved. -need 5yr internal check valve inspection and report. -order knox box, install next to riser room, provide key. -I will verify sprinkler monitoring requirment. appears it was monitored at some point. -need to close out cutlers permit. they still owe fees. -obtain operational permit for "places of assembly." |