Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/08/2019 | FIRE SPKLR - FINAL | Approved | ||
| 02/28/2019 | FIRE SPKLR - FINAL | Partial Approval | Sprinkler system modification required for proper coverage. Submit plans and obtain permit through Tucson Fire Dept. Places of Asembly operational permit required through Tucson Fire Dept. Occ load 168. |
|
| 02/20/2019 | FIRE SPKLR - FINAL | Partial Approval | Remove painted tape from several sprinkler heads and if painted replace sprinkler head. |