Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2018 | PLUMBING - ROUGH, SOIL | Approved | ||
| 11/30/2018 | PLUMBING - ROUGH, SOIL | Correction Required | 1-No test on drain pipe. 2-Kitchen drain needs slope. 3-Hot water under slab is PVC. New bath layout does not match approved plans. Note: Existing Bedroom windows have been removed and the sills are furred up too high to meet egress. |
|
| 11/29/2018 | PLUMBING - ROUGH, SOIL | Cancelled | ||
| 11/28/2018 | PLUMBING - ROUGH, SOIL | Correction Required | To many corrections to list, working to get DWV correct. | |
| 11/27/2018 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | Cancelled | |
| 11/21/2018 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | Went over many corrections w/ Contractor Mario, Not Ready | |
| 11/19/2018 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | Provide approved fittings. |