Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/14/2021 | REINFORCED MASONRY PRE-GROUT | Approved | AP | |
03/27/2020 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | ||
03/24/2020 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | ||
03/23/2020 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | ||
03/20/2020 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | ||
03/19/2020 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | ||
03/17/2020 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | ||
03/16/2020 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | ||
03/12/2020 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | ||
03/11/2020 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | ||
03/10/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | west stair and elevator chase redone at top for misplaced bolts. now ok to grout to top out 60'8" | |
03/09/2020 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | ||
03/06/2020 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | ||
03/04/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | West stair/elevator shaft ok to grout to top out at 60' 8" | |
02/28/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | East stair walls ok to grout to top at 60’8" Stems for garbage dump area ok to grout 1st lift. |
|
02/25/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Ok to grout 52’ 8" to 58’ 4" on the east stair tower. | |
02/14/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Both stair and elevator chase ok to grout to 45" 4" | |
02/13/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | GL 1 @ B3 to A3 and A3 @ 1 to 3.5 - ok to grout stems to 2nd lift. | |
02/07/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Ok to grout north wall 1st lift from A - 5 to3.5 Ok to grout E W stair/ elevator shafts 34’8" to 40’ |
|
02/06/2020 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | ||
02/04/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 2nd lift of walls ok to grout. A - 5 to 3, B.2 - 5 to 1 E W stairs and elevator ok to grout to 34’ 8" |
|
01/28/2020 | REINFORCED MASONRY PRE-GROUT | Partial Approval | SHEARWALLS AT GL 2, 3, 4 - A -B.2 OK TO GROUT 1ST LIFT | |