Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 11/30/2018 |
PLUMBING - ROUGH, SOIL |
|
Approved |
|
| 11/26/2018 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
lockbox code left on message of 1658 is not working. |
| 11/21/2018 |
PLUMBING - ROUGH, SOIL |
|
Correction Required |
Fill 10’ Head Test, Regrade with min slope of 1/8” per ft side lateral 4” pipe entering Wye in front of doorway. |