Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 12/20/2018 |
ELECTRIC - FINAL |
|
Approved |
OK to clear solar DGC |
| 12/14/2018 |
ELECTRIC - FINAL |
|
Partial Approval |
drawings (e-602.00 page 7) show a 200 amp panel only 100 amp panel installed. Drawings show Se-5000h inverter, SE-3800 is what is installed. Drawings show a 30 amp breaker that is not what is installed. Need to revise drawings or have the revision on site at time of inspection. |