Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2020 | FIRE SPKLR - FINAL | Approved | ||
| 02/13/2020 | FIRE SPKLR - FINAL | Partial Approval | -1 single sprinkler head is going to be installed in the existing oxygen generator area in phase 3 of the construction project. -a separate permit through TFD for sprinkler system is required. |
|
| 11/19/2019 | FIRE SPKLR - FINAL | Partial Approval | Ok to install all ceilings in new construction area. -1 sprinkler head to be added to existing oxygen generator area. -a separate permit through TFD for sprinkler system. |