Inspection History Details
Inspection Status: Denied
Inspection History: ELECTRIC - CONSTRUCTION POWER
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2019 | ELECTRIC - CONSTRUCTION POWER | Denied | Complete electric before reconnect. |
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2019 | ELECTRIC - CONSTRUCTION POWER | Denied | Complete electric before reconnect. |