Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2018 | PLUMBING - FINAL | Approved | Corrections complete. SW Gas = Reconnect, Done! |
|
| 09/13/2018 | PLUMBING - FINAL | Denied | 1- GAS PRESSURE TEST PROVIDED. 2- SHALL EXTEND THE FURNACE FLU VENT AND TERMINATE 3 FEET ABOVE THE EVAP. COOLER. 3- SHALL PROVIDE A GAS BOND ON THE SYSTEM. 4- SHALL PROVIDE A CARBON MONOXCIDE DETECTOR LOCATED IN THE HALLWAY. 5- NOTE; HOMEOWNER STATES THAT THE GAS LINE PENETRATIONS THRU ROOF WILL BE SEALED BY HIM AND ASSUMES RESPONSIBILITY. 6- SHALL PROVIDE (3) SHEET METAL SCREWS PER JOINT ON THE FURNACE FLU VENT. |