Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2019 | ELECTRIC - FINAL | Approved | Cell tower service panel, meter A, and labeled. Ground rods in place, metal gates are bonded. TEP Clearance, ECO TEP was called for Clearance. Message to Roman. ECO |
|
| 07/19/2019 | ELECTRIC - FINAL | Correction Required | Called engineer Roberto. Need access for electrical intermediates and to check grounding/bonding for 2 socket meter panel and gear before final or at final. No access to all above although meter socket and gear are on south exterior wall. Wall would need a building final also. |