Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/30/2019 | FIRE - FINAL | Approved | ||
| 08/09/2019 | FIRE - FINAL | Partial Approval | -Need to verify second class K extinguisher was mounted/installed. -Interconnect duct smokes with FACP or remove them and all associated equipment (test switches, etc...) |
|
| 07/31/2019 | FIRE - FINAL | Prior to Final Inspectn | Notes only. Still needs full fire final inspection. These are items I noticed while tested CO2. -add lockout on co2 breaker. -add facp sign to office door. -add riser room sign to door. -add fdc sign above fdc. -will be adding address #'s to speedway side of bldg. -add key inside knox box. -install/order knox fdc plug -still needs hood final. -still needs to mount extinguisher. -needs to obtain operational permit for POA |
|
| 07/31/2019 | FIRE - FINAL | Partial Approval | -needs to pay fees for operational permit "POA" -FDC sign above connections. -FACP sign on office door. -Add extra class K extinguisher in kitchen. -Add/mount extinguisher in lobby. -Interconnect duct smokes x 2 to FACP or remove them. -Restest EM lights. -fry warmer needs to shut off. its located partially under the hood. APPROVED TO OBTAIN TCO FOR FULL OPERATION. |