Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T18CM06824
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/27/2019 | ENGINEERING - FINAL | Approved | THIS INSPECTION IS BEING APPROVED AT THIS TIME WITH THE INTENT THAT THE NON-COMPLIANT ACCESS FROM THIS SITE WILL BE COMPLETED AND MADE COMPLIANT DURING THE PHASE 2 PORTION OF THE SITE ON DP18-0058. IF THERE ARE ANY QUESTIONS ABOUT THIS SITE YOU CAN CONTACT ME AT (520) 349-7643. OK FOR C OF O PENDING BUILDING OFFICIAL. |
|
11/25/2019 | ENGINEERING - FINAL | Not ready for Inspection | See the notes from the previous two inspections | |
10/11/2019 | ENGINEERING - FINAL | Partial Approval | Engineering has no issues that would prevent a temporary certificate of occupancy. Complete the work shown on the development package permit. Schedule inspections from your development package permit. Don the TOEFL Dent construction. | |
10/03/2019 | ENGINEERING - FINAL | Denied | COMPLETE ALL WORK SHOWN ON THE APPROVED DEVELOMENT PACKAGE AND COMBO PLAN PRIOR TO CALLING IN FOR THIS FINAL INSPECTION. I WALED THE SITE WITH DON VIGIL FROM TOFEL DENT AND WENT OVER SOME OF THE ITEMS HE WILL NEED TO ADDRESS PRIOT TO RECEIVING THE C OF O FOR THIS BUILDING. I HAVE ASKED THAT HE CALL IN THE GRADING FINAL FOR THE DEVELOPMENT PACKAGE AS WELL AS THE ENGINEERING FINAL FOR THIS COMBO PERMIT. HE HAS BEEN ADVISED THAT A FINAL C OF O CAN NOT BE GRANTED TILL ALL OF THE SITE WORK IS COMPETED AND APPROVED. |