Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 10/11/2019 |
FRAMING |
|
Approved |
|
| 06/18/2019 |
FRAMING |
|
Partial Approval |
Exterior soffits |
| 05/28/2019 |
FRAMING |
|
Partial Approval |
West exterior wall from 3rd floor to roof. Bolting/nailing of glue lam hangers for all levels, need to shim several glue lam on roof level south side. |
| 05/21/2019 |
FRAMING |
|
Partial Approval |
1- East wall framing and clips okay from the 3rd floor to roof. |
| 05/13/2019 |
FRAMING |
|
Partial Approval |
West exterior wall at Level #2. Ok to cover progress areas. |
| 04/23/2019 |
FRAMING |
|
Partial Approval |
2nd floor exterior east wall ok to cover exterior |
| 04/12/2019 |
FRAMING |
|
Partial Approval |
Second-floor stairwell and elevator shaft |
| 03/22/2019 |
FRAMING |
|
Partial Approval |
First floor stairwell |
| 03/18/2019 |
FRAMING |
|
Partial Approval |
Bolting of glue lams on west side of building |