Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/30/2018 | BUILDING PRE-SLAB | Approved | ||
| 10/22/2018 | BUILDING PRE-SLAB | Correction Required | Footings to be a minimum of 12” below natural grade and a min of 6” above may grade. For a min of 18”. If electric going uninstall UFER ground that is min 20’ long plus bend and turn up out of slab to attach your GEC. Add some grey elect conduit below where you want your sub panel located so you can create a raceway to the main service for electrical feeders to the sub |