Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2018 | PLUMBING - INTERMEDIATE | Approved | ||
| 11/02/2018 | PLUMBING - INTERMEDIATE | Denied | 1- Shall locate the 3 inch soil stack clean out located in the powder room to have 18 inches of frontal clearance. 2- Re test the DWV system. |
|
| 11/01/2018 | PLUMBING - INTERMEDIATE | Not ready for Inspection | Fill DWV and PEX |