Inspection Status: Canceled
Inspection History: COT - RSME - Mechanical Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/07/2022 |
COT - RSME - Mechanical Final |
|
Canceled |
Inspection Canceled |
| 09/04/2020 |
COT - RSME - Mechanical Final |
WGALLAGHER |
Cancelled |
Entered by JSCHNEI2 - No contact from contractor |
| 11/12/2019 |
COT - RSME - Mechanical Final |
MRAMBER |
Not ready for Inspection |
Entered by DMERANZ1 - Provide minimum 1 inch clearance to combustible‘s at furnace and water heater, Flue pipe to be 3 foot minimum above cooler inlet. Provide Myers hub at conduit entering top of panel, provide cover plate at LB entering panel. |