Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/13/2018 | ELECTRIC - FINAL | Approved | ||
| 09/12/2018 | ELECTRIC - FINAL | Correction Required | Tight accorn bolts on GEC-loose wires Water is primary bbond and gas is secondary bond. Need to see Water Bond, could not find?. Secure all #4 to the building or bury deeply to protect as required. |