Inspection History Details
Inspection Status: Approved
Inspection History: ROOF NAILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2019 | ROOF NAILING | Approved | paperwork approved by engineer on A1 fix | |
| 02/12/2019 | ROOF NAILING | Partial Approval | truss calcs incorrect, don’t match what’s installed although numbers do match, needs clarification. Engineer fix on A1 trusses needs to be per drawing or we need approval from engineer on current fix | |
| 01/31/2019 | ROOF NAILING | Denied | Provide diaphragm nailing per detail D/D1 Provide a proof trust calf’s Provide engineer fix at A01 trusses |
|
| 01/24/2019 | ROOF NAILING | Denied | nailing incomplete plywood movement at shiners and no ladder we checked from inside |