Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/26/2018 | PLUMBING - ROUGH, SOIL | Approved | ||
| 09/18/2018 | PLUMBING - ROUGH, SOIL | Partial Approval | Correct previous corrections or proceed at own risk until revisions approved by COT. | |
| 09/14/2018 | PLUMBING - ROUGH, SOIL | Denied | CORRECTIONS STILL OUTSTANDING, SEE NOTICE FROM 9-11-18 | |
| 09/12/2018 | PLUMBING - ROUGH, SOIL | Denied | Work not completed no test | |
| 09/11/2018 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL PROVIDE A 3 INCH WASTE LINE FOR THE CLOTHES WASHER AS PER PLAN. 2- SHALL PROVIDE A FIRM BED ON ALL HORIZONTAL PIPING, NO BRIDGING ALLOWED. * |