Permit: T18CM06524

Parcel: 14002010A

Inspection Status: Partial Approval

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
11/09/2018 PLUMBING - ROUGH, SOIL Partial Approval 1-4" PVC P Trap relocate
11/08/2018 PLUMBING - ROUGH, SOIL Partial Approval area 15 to 18, Line B through D includes restrooms
11/05/2018 PLUMBING - ROUGH, SOIL Partial Approval from grid 13 to grade 16 between lines be in D underground four-inch PVC to 6 inch PVC waste.
10/26/2018 PLUMBING - ROUGH, SOIL Partial Approval Soil Pipe between Lines 8 & 9 in Mechanical Room
10/25/2018 PLUMBING - ROUGH, SOIL Not ready for Inspection Call Superintendent Clint Harris later today
10/19/2018 PLUMBING - ROUGH, SOIL Partial Approval Soil pipe in between second and third gridlines all complete except chiller
10/18/2018 PLUMBING - ROUGH, SOIL Partial Approval North and South Waste Piping between B and C between 4 and 6
These inspections were for Diversified