Permit: T18CM06524

Parcel: 14002010A

Inspection Status: Partial Approval

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
01/18/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Between 2 & 5- D & E 18"EW #4 Bar
3 #6 Pins at Columns Southside 4E&3E
3 #6 Pins at Columns Northside 3B&4B
4 #5 Bars & #4 Hooks in North and South Footings
All work reflects plan documents
01/16/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Grid 3 B4 F3 Footing 6'X6' 8-#5 Bars EW T&B
01/09/2019 EXCAVATION/LAYOUT REBAR & ZON Approved F6 Line 2 Green columns Line A & B 2#6 Matt’s 8"X12" Continuous Footing with F3
#5 8" OC 2 Matt’s 9’X16’3"X28"depth
F3 Line C1 8"X12" #5 Bars WF2 18" depth
F4 Line C 30"X10’10" 8"X12"#6 2 Matts
01/08/2019 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
01/07/2019 EXCAVATION/LAYOUT REBAR & ZON Cancelled
01/03/2019 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
12/18/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 2-6"X12" 6" Mats and 2-10x15 #Bars Line E and 18
12/17/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Grd Line 16 & 17 8"EW 9'6"X 24" Footing, Grid Line B Between 17 & 18 F3 Footing 8"EW 2 Matts 16" Thick
11/30/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
11/30/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval #4 18" EW between D & E 12 & 14.5 South
4-#7 Hair Pins at 13 & 14 North
#4 18" EW between 14 & 15 midway B & C
#4 18" EW between 12 & 13
11/29/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
11/21/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
11/19/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 4" welded wire mid portion of slab, with #4 18" EW for the remainder, per structural plan. Type A hair pins 4- #7 and 4- #6 bars spred, then wrapped around anchor bolts at pier Footings 5 and 6 on South side. Type B hair pins 8- #7 bars around anchor bolts on North side. #4 L bars 24" OC along north side of slab.
11/16/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
11/14/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Line C Pier Footings Number 3 through 16 Installed per plan page1SO2.200 Detail F7 12"EW, #6 Footing Depth 24", Length and Width 9'6"
11/14/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Line B Between 12 and 13 Inclusive 18" EW #4 Bar Mat, raised 3" with adobies
11/14/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Column line 9-12 and B-E. #4 18x18 grid for bldg 1 Slab, also WWM 4x4 158.200 sheets
11/13/2018 EXCAVATION/LAYOUT REBAR & ZON Approved Lined be between 12 and 13 inclusive 18 inch each Way number 4 bar Mat, raised 3 inches with adobes
11/12/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
11/08/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
11/07/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Three F3 type footings online D between five and six each pad contains a number 5 rebar each way D 5 footing also a F3 Type all footings contain 2 Pads of 8 #5 Bar EW
3 F3 Type Footings at line 11 and 12 between D and D5 8#5 Bar EW with 2
11/07/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
11/06/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
11/02/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
11/01/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
10/31/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Line C putting is D3D 18 D6 18 and 4
Line E 16, 17, and D 17
10/30/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
10/29/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
10/25/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
10/23/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval line 1 and isolated footings of WF 2 Type and Masonary footings 5‘6" in depth with 16 inch on center number five verts. L1-8 F11 footings. Elevator Pit 2-#5 Mats 12" EW, 3'X18" Sump
10/23/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval elevator pit footing with to number five matches 12 inch each way
10/22/2018 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection Rebar incomplete for Grid 1 Footings
10/22/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
10/19/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
10/18/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
10/18/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval F1 footing E 13
F2 footings E 14 and E 15
10/17/2018 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection ground too wet well recall
10/17/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
10/16/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
10/12/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval B-3 Pier Footing, per Plan
E-9,10,11,12 Pier Footing pes Plan
10/11/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval footings D9, 10, 11, 12 per plan
B4 and B5 Per plan
10/10/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Line B 12and 17Pier Footings per plan
Line D 4,5,13,14,15, and 16 Footings per plan
10/09/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval excavation, rebar, and zoning, Line B, Pier Footings 14, 15, 16, and 17 are per plan. Line E, Pier Footings 3 and 3.1
10/08/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
10/05/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval D3 three and four AP
E3 and E3.3 AP
D4AP
D3 AP
D 3.4 AP
D5 AP
Line B 11, 13, 14 AP
Line D 13, 14 AP
10/05/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
10/04/2018 EXCAVATION/LAYOUT REBAR & ZON Cancelled IVRS - AP canceled
10/03/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval LINE C FTS 3 TROUGH 16 ALL PER ISO2.200 INSTALL PER PLAN
10/01/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval APPROVED THE FOLLOWING;
LINE B 6 THRU 10 PIER FOOTINGS WITH CONCLUSIVE CAGES PER PLAN SPECS
LINE D 6,7,AND 8 SAME AS ABOVE
LINE C 7,8,AND 9 SINGLE MATT 8" #5 PER PLAN
09/26/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Approved; Bldg 1-Footing/pilaster, east line @ south side 4 through 8 conclusive-cages. B Line e center slab.